Keeneland Downs Sanitary Sewer Pumping Station Abandonment

About This Project

This project connected 2 gravity sewer systems, eliminating the need for an existing failing pumping station. It included 300LF of no-blast sewer installation at depths of 7 VF to 15 VF, both inside and outside of public roadways, live connections to existing sewer systems, abandonment of the existing pump station and bypass pumping.

Project Details

Clients

Metro Water Services

Project Type

Sewer Pipeline Repair

SewerKristi Simard