Franklin Emergency 54” Sewer Repair
About This Project
This project consisted of excavating/removing existing segment of failed 54” Hobas pipe. Furnishing/installing/backfilling/joint testing new 54” Ductile Iron Pipe with 401 Ceramic Epoxy Lining with connections to existing upstream and downstream manholes. Price includes crushed stone backfill from 1 foot below the pipe to 1-1/2 feet above the pipe. All other backfill to be native material.
Project Details
Client
City of Franklin
Water Management Department
Project Type
Sewer Pipeline Repair