PSC Metals Stormwater
About This Project
This project is located inside the PSC Metals Nashville facility. It required daily coordination with our counterparts at PSC to ensure the safe delivery of the project. This project consisted of the excavation and re-shaping of four detention ponds, 600 LF of HDPE storm drain, pre-cast grit chamber, manholes, concrete restoration and landscaping.
Project Details
Client
PSC Metals, Inc
Project Type
Storm Water Improvements