Surrey Road
About This Project
Located in Donelson, these stormwater improvements consisted of the removal of 16 storm drain structures, approximately 450 CY of road and drainage excavation, and the installation of 88 linear feet of HERCP to upsize the smaller capacity corrugated metal pipe running below Surrey Road. Project scope also included over 450 LF of ditch excavation and the construction of approximately 40 CY of concrete channels, head walls, and end walls to mitigate flooding issues, as well as the installation of two 5’ X 16’ pedestrian bridges.
Project Details
Clients
Metro Water Services - Stormwater
Project Type
Stormwater System Improvements