Wildwood Valley Waterline
About This Project
This project consisted of replacing the existing water main with over 15,300 LF of new 6” - 16” restrained joint (RJ) DIP water line as well as installing a 4-inch meter vault, one stream crossing, connections to existing system, valves, 18 fire hydrant assemblies, fittings, reconnections of existing services and other ancillary appurtenances. Significant erosion prevention and sediment control, traffic control and site restoration as well as 5,417 LF of trench patch pavement repair and 8,200 SY of asphalt road surface were also included in the project scope.
Project Details
Clients
Harpeth Valley Utility District
Project Type
Water Pipelines