Main Street at 10th Avenue

About This Project

Our pipe rehabilitation team utilized trenchless technology to swiftly deliver a Nashville Metro Water Services roadway repair project at an extremely busy intersection in East Nashville. WBG was called to address an issue with subsidence in the roadway and it was discovered that joints in the 36” reinforced concrete pipe (RCP) were separated, areas of the pipe were broken, and the pipe was also poorly connected to manholes. When compared to the traditional dig and replace method, our trenchless process resolved these issues with minor impacts to traffic and pedestrians and minimal disturbance to surrounding businesses.

Project Details

Client

Nashville Metro Water Services

Project Type

Pipe Rehabilitation – PVC Fold & Form

Pipe RehabKristi Simard